MV netwok design for 75 new houses in Damborice
Makuta, Peter ; Novák, Vojtěch (referee) ; Ptáček, Michal (advisor)
Content of this thesis is medium voltage network design for seventy five houses in Damborice. At the beginning author discuss about history of transmission network and distribution network. Next topic is about steady state of network. In theoretic part are different solving methods of linear and non-linear simultaneous equations discussed. Author describes four methods – method of node voltages, elimination of balance node, Gauss-Seidel and Newton method. The electric properties of both the overhead transmission lines and cable lines and their variety are part of this work too. There is purpose, forms and parameters of transformers described. Simplicity of author’s design should reduce the usage of many electrical elements visible to residents.
Design of the distribution network branch for new family and apartment houses in Újezd u Brna
Frechová, Lucie ; Novák, Vojtěch (referee) ; Ptáček, Michal (advisor)
The work mentions the concept of present electricity networks in the Czech Republic and based on voltage levels it also describes distribution networks in more detail. Furthermore it brings the analysis of legislative conditions and technical aspects, under the rules of the distribution network operation, for new customers who require new connection to electricity network. Because of the steady-state network evaluation represents very important issue of the power system calculations, therefore it is explained in theoretical part of this work. Nowadays, Gauss-Seidel method and Newton iterative method are generally used for the steady-state analysis. Mentioned ones are also described and compared together in theoretical part. Furthermore methods are applied in practical part which solves specific configuration of the network in a given area. Moreover there are the basics of the conductor sizing in terms of the warming, both during normal operation and during a short circuit. However, it is necessary to respect other aspects of the conductor sizing, therefore issues of mechanical and electrical strength, the voltage drop and the sizing economy are also shown. There is also the characteristic of proposed and the description of the individual components which are used for the network i.e. transformation station, HV and LV switchgear, transformer, HV and LV cabling. It also concludes the characteristics of the design opportunity with their power and economical comparison.
Evaluation of Possibility of New Source Connection With Regard to Nodal Voltage
Němec, Jan ; Topolánek, David (referee) ; Toman, Petr (advisor)
Connection new source of electrical energy into distribution network is important for existing one for reasons its rating and dimensioning. It is even evaluate, whether possibility connection new source in to network is real and do not endanger continuous running distribution system. This work has shown, what conditions are need realize for connection source into distribution network in view of voltage ratio. Next it must incidence harmonic current and affecting centralized telecontrol signal about reasoning. Against a background examination connection source are administrative acts, which forms basis of successful connection. On basis lets request of connection mostly study of connection working up. This study contains concrete calculation and examination individual factors for connection new source. Next put mind to connection wind power station, because wind power stations are very special source for connection into distribution network. Bigger demands are putting on them and stricter examination of connection to site must be done. Because during time unit (day, week and month) they have various strain diagram. Which makes higher straining of distribution and necessity have reserve of electrical energy for case fail wind power station owing to windless ness. In the end, there is referred to practical examination example of possibility connecting. As this example was chosen examination of wind park to 110 kW network with 32 MVA installed power from view of voltage ratio. Solution process is given by replacement of part of given Picells link and by calculation steady state of node site system with Gauss-Seidels iteration method. After that follows evaluation of voltage change in the site before and after connection of source to the network, which can not be higher than 2%. In this example is this condition satisfied and from a view of voltage ratio there is nothing to obstruct for connection new source to network.
MV netwok design for 75 new houses in Damborice
Makuta, Peter ; Novák, Vojtěch (referee) ; Ptáček, Michal (advisor)
Content of this thesis is medium voltage network design for seventy five houses in Damborice. At the beginning author discuss about history of transmission network and distribution network. Next topic is about steady state of network. In theoretic part are different solving methods of linear and non-linear simultaneous equations discussed. Author describes four methods – method of node voltages, elimination of balance node, Gauss-Seidel and Newton method. The electric properties of both the overhead transmission lines and cable lines and their variety are part of this work too. There is purpose, forms and parameters of transformers described. Simplicity of author’s design should reduce the usage of many electrical elements visible to residents.
Design of the distribution network branch for new family and apartment houses in Újezd u Brna
Frechová, Lucie ; Novák, Vojtěch (referee) ; Ptáček, Michal (advisor)
The work mentions the concept of present electricity networks in the Czech Republic and based on voltage levels it also describes distribution networks in more detail. Furthermore it brings the analysis of legislative conditions and technical aspects, under the rules of the distribution network operation, for new customers who require new connection to electricity network. Because of the steady-state network evaluation represents very important issue of the power system calculations, therefore it is explained in theoretical part of this work. Nowadays, Gauss-Seidel method and Newton iterative method are generally used for the steady-state analysis. Mentioned ones are also described and compared together in theoretical part. Furthermore methods are applied in practical part which solves specific configuration of the network in a given area. Moreover there are the basics of the conductor sizing in terms of the warming, both during normal operation and during a short circuit. However, it is necessary to respect other aspects of the conductor sizing, therefore issues of mechanical and electrical strength, the voltage drop and the sizing economy are also shown. There is also the characteristic of proposed and the description of the individual components which are used for the network i.e. transformation station, HV and LV switchgear, transformer, HV and LV cabling. It also concludes the characteristics of the design opportunity with their power and economical comparison.
Evaluation of Possibility of New Source Connection With Regard to Nodal Voltage
Němec, Jan ; Topolánek, David (referee) ; Toman, Petr (advisor)
Connection new source of electrical energy into distribution network is important for existing one for reasons its rating and dimensioning. It is even evaluate, whether possibility connection new source in to network is real and do not endanger continuous running distribution system. This work has shown, what conditions are need realize for connection source into distribution network in view of voltage ratio. Next it must incidence harmonic current and affecting centralized telecontrol signal about reasoning. Against a background examination connection source are administrative acts, which forms basis of successful connection. On basis lets request of connection mostly study of connection working up. This study contains concrete calculation and examination individual factors for connection new source. Next put mind to connection wind power station, because wind power stations are very special source for connection into distribution network. Bigger demands are putting on them and stricter examination of connection to site must be done. Because during time unit (day, week and month) they have various strain diagram. Which makes higher straining of distribution and necessity have reserve of electrical energy for case fail wind power station owing to windless ness. In the end, there is referred to practical examination example of possibility connecting. As this example was chosen examination of wind park to 110 kW network with 32 MVA installed power from view of voltage ratio. Solution process is given by replacement of part of given Picells link and by calculation steady state of node site system with Gauss-Seidels iteration method. After that follows evaluation of voltage change in the site before and after connection of source to the network, which can not be higher than 2%. In this example is this condition satisfied and from a view of voltage ratio there is nothing to obstruct for connection new source to network.